Most erosion and sediment control plans, such as Stormwater Pollution Prevention Plans (SWPPPs), incorporate Stormdrain Inlet Sediment Traps (Sd2) as integral components within a system of sediment control devices. These devices are meticulously designed, installed, and maintained to effectively intercept and filter sediment. The primary goal is to prevent sediment from being transported off-site or entering on-site sediment basins.